Renovation of Finca Santa Ana

In two weeks Finca Santa Ana will be ready for the new season

We used the lockdown to renovate our finca. In January we had already started a renovation that would be finished in early April. The crisis has caused some delay, but we immediately improved a number of extra things. We assume that we will be ready by the end of May. Attached are some pictures. As soon as we are ready, we will post the pictures of the result.

We have renovated the living area, enlarged the kitchen and a built a new bathroom. The kitchen now has an American fridge where you can tap cold filtered water: there is also a new large dining table. The sofa in the lounge corner was replaced with a comfortable sofa bed, suitable for 1 adult or 2 children. (160cm wide)

The master bedroom now has a private bathroom since we sacrificed one small room. The second bedroom was significantly enlarged and has its own bathroom. The garden bedroom has air conditioning / heating and a smart TV and now has its own bathroom in the main house. The total number of sleeping places has remained the same.

The entire house, if everything goes smoothly, will be equipped with high speed ​​internet (300Mb) by fibreoptic from June to replace the current ADSL connection.

The garden has also been refurbished. The rainwater is collected, so that we have more water available, even in mid-summer, for watering the garden. A new bench was built near the trampoline, which is incorporated into the lawn.Finally, like every year, the house has been given a new coat of paint.

With these changes, we hope to offer our guests a nice holiday stay.

Situation May, 1st 2020

Renovation May 2020

At the end of May we will post the photos of the final result